Pre-engineered steel building in Millersburg, Ohio erected in two weeks from start to finish.
(mouse over image to see a description of what’s being shown)
Real World Performance Products
Pre-engineered steel building with 1” WRE 3Ht on walls.
Building Project in Millersburg, OH
1” WRE 3Ht on the walls and the roof.
Complete Building Envelope
½” RRE 3Ht placed under concrete radiant heat floor.
Heater for Radiant Heat Floor
Instant on 240,000 BTU heater for radiant heat floor.
Erected from Start to Completion in Two Weeks
1” WRE 3Ht on finished walls and ceiling.
Finished Pre-Engineered Steel Building in Millersburg, OH
1” WRE on walls and roof, ½” RRE 3Ht placed under concrete.